Looking good man! Can't wait to get in on this.. or at least get some grub off it! :)
Announcement
Collapse
No announcement yet.
New Build: MMP2
Collapse
X
-
Originally posted by massive meat pipe View PostWhat do you all think is the best way to install the clean out on a reverse flow? To the baffle or the bottom of the CC? See the attached picture.
Thanx!
I would do both...
with main chamber pitched well down an away from the firebox...
bottom drain down at the lowest possible point...
maybe line um up
careful for valve(s) handle interference...
gotta get her drained/dried out after washin an cleaning or rain an residue...
this puppys gonna be great...~All that is gold does not glitter ~ Not all those that wander are lost~~20" Yoder "Swiss Army Knife" Stick Burner~
Comment
-
Originally posted by MoonSwine View PostLooking good man! Can't wait to get in on this.. or at least get some grub off it! :)
Comment
-
Originally posted by THUMPERRRR View PostI would do both...
with main chamber pitched well down an away from the firebox...
bottom drain down at the lowest possible point...
maybe line um up
careful for valve(s) handle interference...
gotta get her drained/dried out after washin an cleaning or rain an residue...
this puppys gonna be great...
Comment
-
Originally posted by massive meat pipe View PostTrailor i got for free.99! Today i start workin it.
but I have faith you'll make it right...~All that is gold does not glitter ~ Not all those that wander are lost~~20" Yoder "Swiss Army Knife" Stick Burner~
Comment
-
looks like a good reason/time to add an inch or inch an half wide by at least 1/4 thk stiffener strip stiched on edge below the bottom horizontal opening just right so the grill rack sits flush with opening (or a fraction above) as a stiffener maybe,,,
and a matching strip on the backside and both sides...(grill racks sit on)
an maybe the same matl. as a border around the door...
just my thoughts...~All that is gold does not glitter ~ Not all those that wander are lost~~20" Yoder "Swiss Army Knife" Stick Burner~
Comment
-
Build update: 10-12-14
Reverse plate cut, built and installed. Firebox mounted and welded into place. Bumper prepped and installed. Stacks cut and installed. Bumper prepped and installed. I think I'm finally on the downhill side of the project, getting very excited now. After 17 hours working on it this weekend I am beat. A good weekend for sure.Attached Files- 20141012_183139.jpg (49.1 KB, 25 views)
- 20141012_180720.jpg (49.1 KB, 27 views)
- 20141012_172206.jpg (47.3 KB, 27 views)
- 20141011_163648.jpg (32.9 KB, 29 views)
- 20141011_163636.jpg (29.2 KB, 26 views)
- 20141011_153747.jpg (36.5 KB, 26 views)
- 20141011_112336.jpg (42.8 KB, 27 views)
- 20141012_184526.jpg (40.8 KB, 31 views)
Comment
Comment